SCHLUMBERGER · ENTERPRISE202411 / 17 MONTHS

A decade of accreted tooling, replaced in eleven months.

Schlumberger asked for a seventeen-month BPM rebuild. Twenty-six of us delivered it in eleven, and handed it to a non-technical team to own.

SCOPED
17
MONTHS
DELIVERED
11
MONTHS
01 · CONTEXT

slb.com had reach. It did not have a shape.

Ten years of tooling, layered onto every business surface, with no modular spine and no coherent owner.

The brief: take the accreted tooling apart, replace it with modular surfaces, hand the result to teams that can run it without engineering on call.

Vast

Years of internal tooling layered onto every business surface.

Brittle

Workflows tied to teams that had since moved or merged.

Stuck

Non-technical owners locked out of routine changes.

02 · COMPRESSION

Six months of slack, recovered by sequencing.

Where the original plan ran phases in series, we ran scoping, design, and build with overlapping handoffs. Each phase shipped a production surface; nothing waited for a final reveal.

P1
M01–M02

Scoping

Audit of legacy tooling. Three modules selected for the first cut.

P2
M02–M06

Modular design

BPM patterns, location-aware templates, report and archive scaffolds.

P3
M03–M10

Build, in slices

Each module shipped as a production surface, never staged together.

P4
M09–M11

Handoff

Documentation, training, ownership passed to non-technical teams.

03 · WHAT SHIPPED

Five modules. One spine.

M01

Workflow engine

Job creation, templating, recurring schedules, role-bound approvals.

M02

Location-aware templates

Surfaces adapt to user region, language, and business unit on first render.

M03

Report library

Generated, versioned, signed-off reports with audit trail.

M04

Archive search

Federated search over decade-old artefacts, with permission walls intact.

M05

Owner console

Non-technical surface for routine changes. No engineering ticket required.

04 · BENCH

Twenty-six people, sequenced, not stacked.

04
PRODUCT
06
DESIGN + RESEARCH
09
ENGINEERING
03
DATA + INTEGRATIONS
02
DEVOPS
02
QA

We did not ship a platform. We shipped an owner.

When a non-technical team can configure, audit, and extend an enterprise platform without engineering intervention, the platform is done. Schlumberger inherited that posture in eleven months. It is one of the largest delivery compressions in the studio's history.

A decade of accreted tooling, replaced. Eleven months. Twenty-six people. One spine.

SCHLUMBERGER · 2022–2024Start a similar engagement →